
Residential Villa Container Transformation
Engineering, full house package procurement, logistics and technical support for assembly of 33 residential light gauge steel (LGS) villas
Tested and supplied from China, a complete package of materials needed for construction of 33 (single and two level) homes. Engineering and procurement departments coordinated all parts along with suppliers to ensure we supplied everything down to the last screw, and that all parts fit together.
Package included LGS frame, roofing, flashing, Exterior cladding, windows and doors, sheet goods, electrical, plumbing, kitchen and bathroom fittings, cabinetry, floor coverings etc. Shipping logistics and site support: The first batch of Light Gauge Steel (LGS) house frames shipped 45 days after order was placed. Modular managed all supplier QC,
Logistics and consolidation of less than container load goods, to ensure products arrive at the construction site (35 days ocean transport) in the right sequence with no parts missing) This enabled our customer to optimised the construction time, without work stoppages.
Power in Numbers
Projects
Locations
Timeline
Project Gallery













