
Luxury Modular Hotels
Design, engineer, build, ship and install 5 star modular hotel in 3.5 months. Install location at high altitude in remote location with poor access roads. Rooms had to be very high end and not in any way appear modular.
Site is environmentally sensitive, very remote (no road access) needing low-impact build. Lack of local skilled labor. Electrical, water and heating limitations. Desire to provide luxury, glamour camping experience. Solution Camp:
Designed an environmentally friendly prefabricated turnkey camp solution. Depending on the site and services required, we can provide solutions for wastewater management and electrical generation.
Common areas are built with custom steel prefabricated modules. Each building consists of several container like modules, is completely finished, assembled and tested in Modular Future China factory to ensure perfect finish inside and out. Modules are then disassembled and packed for shipping.
Modules can be airlifted for remote site install if necessary. Guest rooms are heated, insulated geodesic domes, with private bathrooms and sleeping lofts. Geodesic domes can be installed in 2 days, and provide a super luxury camping experience, with minimal local site impact.
Power in Numbers
Projects
Locations
Timeline
Project Gallery















